Spring at Minto Gardens

Spring at Minto Gardens

Architect
Page + Steele IBI Architects
Developer
The Minto Group Inc.
Landscape Architect
NAK Design Group
General Contractor
Minto Urban Developments
About the Project

The “Spring at Minto Gardens” project is the second phase of the mixed-use development located in the area of Yonge Street and Sheppard Avenue intersection in the City of Toronto. This phase comprises of a 32 storey mostly glass tower on a 3 storey brick podium housing 342 residential suites and a 3 storey, South facing townhouse structure facing the recently completed Anndale Street. All 16 townhouses have main entrances off the street and the easterly most 11 units feature direct access to the outdoor amenities in the courtyard. The podium is connected to the existing 3 storey lobby and amenity component of phase 1. Amenities include atrium lounge, indoor pool, equipped fitness centre, games room, business centre, party and dining room and 24–hour concierge. Following Phase 1 “Radiance at Minto Gardens” precedent as the first high-rise residential building in Canada to receive LEED certification,”Spring” has achieved the advance rating of LEED Silver, issued by Canada Green Building Council.

Disclaimer: The Pug Awards makes every effort to obtain the most accurate information possible, working with both the City of Toronto and UrbanNation to compile the list of official nominees, vetted against the selection criteria. Once the list has been finalized both the Architect of Record and Developers of each project are notified and provided with submission guidelines on how to supply images and supporting text. In the instance that no information is submitted, or submitted images do not follow the provided submission guidelines, the Pug Awards assigns a professional photographer to photograph the project.

If you believe any nominee information to be inaccurate please notify us at: [email protected].

Voting Closed

 
 

2014 Sponsors